Novomorphic

UK-designed electronics for defence and aerospace

Secure sensing, edge intelligence and control, supportable for decades.

What we bring
  • System Architecture
  • Mixed-Signal & RF ASIC
  • Secure Edge AI
  • Security, Safety & Lifecycle
Applied in
SENTINEL-AI
First step
Architecture workshopOne to two days. Written opinion within a week.

What makes these programmes hard

Fifteen years is the design constraint

The part has to be available in fifteen years, from a supply chain you can account for. Timing has to be provable, not merely typical. Security has to be architectural, because the threat model will change during the fielded life.

Environmental and qualification requirements shape the design from the start rather than being tested at the end. And export, IP and classification constraints govern what can be said, to whom, at every stage.

What we do about it

Four things we bring

  • Secure sensing and RF front-ends

    Signal chains designed for the environment and the threat model, not adapted from a commercial part.

  • Deterministic edge intelligence

    Local processing inside real power and latency envelopes, where a cloud round trip is not available and would not be acceptable if it were.

  • Hardware-enforced trust boundaries

    Critical control isolated by construction, with a lifecycle designed for the length of the deployment.

  • UK-controlled design and IP

    Design and IP held in the UK, with the fabrication and packaging interface described honestly rather than overstated.

MARKETS · DEFENCE

Built for the day things go wrong

Take away GNSS, the link or the supply chain. Watch what holds.

Build
Threats

Commercial parts fail together.

PNTSENSEREPORTKEYSSUPPORT80%HELDCapability held: 80 percent
Held4
Half0
Lost1

Illustrative scenario for a generic sensing node.

Why Novomorphic

UK design, and plain claims

UK-based, UK-registered, and building UK-owned semiconductor IP through funded R&D. One team across the signal chain, the compute and the control, so the interfaces are designed.

A gated route from architecture through FPGA validation towards silicon, with a decision at each gate. Plans are described as plans and results as results, which matters more to a technical assessor than any capability claim.

MARKETS · SPACE

No repair crew in orbit

Pick the orbit and parts. Radiation does the rest.

Orbit
Parts
Memory
Dose20/ 10 krad
Upset8
Corrected0

Parts wear out in year 2.

Illustrative doses and upset rates, with 2x dose margin.

Standards

The standards your programme is judged against

Each one is marked: a certificate or registration we hold, or a standard we design to.

  • JOSCAR

    On the supplier register UK aerospace, defence and security buyers use to pre-qualify suppliers.

    We are registered

  • ISO 27001

    Certified information security for the requirements and designs you share with us.

    We are certified

  • Cyber Essentials Plus

    The UK Government scheme, at the tier with an independent technical audit.

    We are certified

  • ISO 9001

    A certified quality management system covering design and development.

    We are certified

How to engage

Start under NDA

Architecture workshop, feasibility study, FPGA proof-of-concept or full design programme. For anything touching sensitive requirements, we start with an NDA and a controlled technical session rather than a document exchange.

Programmes

Applied in SENTINEL-AI

These are research and development programmes in progress, not products.

How engagement starts

Four ways to start, none of them a leap

  • 01

    Architecture workshop

    One to two days

    A working session with your engineering team. You leave with a partitioning opinion, the interface risks named, and a scoped route forward.

    Output: Written opinion within a week

  • 02

    Feasibility study

    Two to six weeks

    Can this be built to your envelope, on which technology, at what risk. A written report with the assumptions exposed so you can challenge them.

    Output: Report, budgets, costed route

  • 03

    FPGA proof-of-concept

    Eight to twenty weeks

    Prove the algorithms, interfaces and architecture on hardware before committing to silicon. Ends with results on hardware, not an opinion.

    Output: Hardware, test report, migration assessment

  • 04

    Design programme

    Programme length

    Full development to tape-out, or to an integration-ready hardware and firmware assembly, with defined gates at each phase.

    Output: Tape-out database or integration-ready assembly

Compare what each one includes

Tell us what you are building

An engineer reviews every enquiry. We will come back with a technical view, not a brochure.

Everything you send is treated as confidential. We can sign an NDA before any technical detail is exchanged.

What happens next

1

An engineer reads it

Not a form-handler. Whoever owns the relevant discipline.

2

We come back with a technical view

Including if we think you do not need us.

3

If it looks like a fit, a short technical call

Then, if it is useful, a scoped workshop, feasibility study or evaluation.