Programmable RF, with a route to silicon
Adaptive RF hardware, from prototype to manufacturable silicon.
- What we bring
- Mixed-Signal & RF ASIC
- Compound Semiconductor
- FPGA Prototyping
- Security, Safety & Lifecycle
- Applied in
- GRID-5G
- First step
- Architecture workshopOne to two days. Written opinion within a week.
What makes these programmes hard
Demonstrators stall at manufacturability
Fixed-function RF hardware cannot adapt to conditions that change by the minute. Research demonstrators prove a concept and then stall, because nobody owns the path from demonstrator to manufacturable, controllable, secure hardware.
Integrated sensing and communication needs the RF, the processing and the control designed together. And the control plane of programmable RF is a security surface that arrives with the programmability.
Use cases
Four applications
Adaptive coverage
RF behaviour that responds to the environment rather than to a commissioning setting.
Co-scheduled sensing
Sensing and communication sharing the same hardware and the same time budget.
Secure infrastructure
Hardware-enforced control of the configuration and data paths that make programmability safe.
Custom silicon
The size, power and cost step that turns an integrated prototype into a deployable product.
MARKETS · TELECOMS AND OPEN RAN
A network that sleeps when the city does
Quiet cells sleep while neighbours carry the traffic. Play the day.
Neighbours carry the traffic; the radio wakes in milliseconds.
Illustrative traffic and power for a 19-cell urban cluster.
Why Novomorphic
RF depth and silicon depth, in one team
UK-controlled design and IP. RF and mixed-signal depth alongside digital and edge-AI capability, in one team. A documented FPGA-to-ASIC route rather than an aspiration.
And security integrated into the control plane at architecture, because retrofitting it into programmable RF is not realistic.
How to engage
A briefing, honestly scoped
A technical briefing, an architecture workshop, an FPGA proof-of-concept, or a custom ASIC programme. For most telecoms conversations the useful first step is a briefing on architecture fit and maturity, including an honest view of what is not yet proven.
Programmes
Applied in GRID-5G
These are research and development programmes in progress, not products.
Capabilities
What we bring to Telecoms & Open RAN
- Mixed-Signal & RF ASIC DesignTurn a difficult signal-chain requirement into a silicon design.
- Compound Semiconductor: GaN, SiC & RFWide-bandgap and RF design where efficiency and power density decide the product.
- FPGA Prototyping & Pre-Silicon ValidationProve the architecture before you fund the silicon.
- Security, Safety & Lifecycle AssuranceTrust boundaries designed in, not bolted on.
How engagement starts
Four ways to start, none of them a leap
- 01
Architecture workshop
One to two days
A working session with your engineering team. You leave with a partitioning opinion, the interface risks named, and a scoped route forward.
Output: Written opinion within a week
- 02
Feasibility study
Two to six weeks
Can this be built to your envelope, on which technology, at what risk. A written report with the assumptions exposed so you can challenge them.
Output: Report, budgets, costed route
- 03
FPGA proof-of-concept
Eight to twenty weeks
Prove the algorithms, interfaces and architecture on hardware before committing to silicon. Ends with results on hardware, not an opinion.
Output: Hardware, test report, migration assessment
- 04
Design programme
Programme length
Full development to tape-out, or to an integration-ready hardware and firmware assembly, with defined gates at each phase.
Output: Tape-out database or integration-ready assembly
Tell us what you are building
An engineer reviews every enquiry. We will come back with a technical view, not a brochure.
Everything you send is treated as confidential. We can sign an NDA before any technical detail is exchanged.
What happens next
An engineer reads it
Not a form-handler. Whoever owns the relevant discipline.
We come back with a technical view
Including if we think you do not need us.
If it looks like a fit, a short technical call
Then, if it is useful, a scoped workshop, feasibility study or evaluation.
