Engineers writing about the problems real programmes run into.

Four clusters

Organised by the problem, not by the discipline

Written pieces

What is written

Every piece has an HTML page for search plus, where useful, a designed PDF for sharing. We do not publish an opaque PDF as the only artefact.

All 15 pieces, newest first.

Guides

Longer explainers for a buyer or an architect weighing a decision. Each one stands on its own.

  • GuideSystem architecture

    The partitioning checklist

    Six questions decide most of a system partition before anyone chooses a part: reaction time, power source, connectivity, field life, consequence of compromise and annual volume. This guide expands each one into what it changes across sense, compute, connect and act, and why.

    14 min readRead

  • GuideSystem architecture

    How we scope a programme

    Four ways to start, each with a defined input, a defined output and a timebox, and a gate between each one where you can stop. This guide explains what happens inside each engagement, how we decide which one you need, and what we will tell you if the answer is that you do not need us.

    13 min readRead

  • GuideRegulated deployment

    How to read a supplier’s numbers

    A supplier figure can be an intention, a design figure, an objective, a bench measurement or an independently repeated result. They read alike on a datasheet and mean very different things. This guide defines each kind, walks one hypothetical claim through all five, and sets out what a buyer is entitled to ask at each stage.

    12 min readRead

  • GuideRegulated deployment

    The buyer's guide to private 5G for grid OT

    A stand-alone private 5G network can carry protection, control and SCADA traffic for a distribution network. Whether it should is a system question, not a radio question. This guide sets out what to specify, what to ask, and where the evidence will come from.

    16 min readRead

Articles

Technical pieces from the engineers doing the work.

12 pages, PDF

The buyer's guide to private 5G for grid OT

Written for the OT, telecoms and procurement people inside a network operator. What a standalone non-public network is, what protection and SCADA traffic actually requires, the 450 MHz and 3.8 GHz choice, where the edge device sits, what to ask a supplier for, and what GRID-5G sets out to show.

What’s inside

  • What protection and SCADA traffic actually requires
  • The 450 MHz and 3.8 GHz spectrum choice
  • What to ask a supplier for

Have a similar constraint?

If one of these topics is the problem in front of you, skip the article and talk to the engineer who would have written it.

What happens next

1

An engineer reads it

Not a form-handler. Whoever owns the relevant discipline.

2

We come back with a technical view

Including if we think you do not need us.