Electronics for the substation

Surges, heat and twenty years of service.

7 min read

What changes when electronics leave the lab: temperature, EMC, isolation and a twenty-year service life.

Article by Novomorphic engineeringReviewed by Technical review, Novomorphic

SUBSTATION EDGEOne unit between the bay and the coreProtocol fabric, secure core, inference and modem, at the substation.ONE UNITStation busIEC 61850, bay devicesNovomorphic edge platformOne board, four functionsPrivate 5GRadio, core, control roomProtection IEDTrips the breakerMerging unitSamples CT and VTControl IEDSwitchgear controlIEC 61850 fabricProtocol handlingSecure coreRoot of trustEdge inferenceDecisions on site5G modemPrivate 5G linkI and QgNBAMFSMFUPFNRFUDM5G core, standaloneControl room, SCADAStation busDevice tapFunction blockKey bitSignal pathRadio link
Fig. 1: Substation edge

Summary

The bench is the easy part

A device that works on a bench has met one set of conditions: room temperature, a clean supply, a quiet electromagnetic environment and an engineer watching it. A substation offers none of these. It offers minus 40 to plus 85 degrees, switching transients of several kilovolts coupled onto every cable, a DC supply that dips and recovers, and nobody looking at it for years at a time. The standards that describe this environment are specific, numerical and old enough to be well understood. The failures still happen, because they are designed in early and discovered late.

This article sets out what the substation standards actually require, what fails first when they are ignored, and how we design for them from the first schematic rather than at the EMC lab. It is written from the design side. Formal compliance testing is done by accredited houses, and nothing here is a substitute for it.

The standards

Four documents describe the environment

  • IEC 61850-3:2013General requirements for communication and automation IEDs in substations and power plants: construction, design, climatic, mechanical and electromagnetic conditions. Edition 2 aligned its EMC requirements with the IEC 60255 series and IEC 61000-6-5, and added product safety by reference to IEC 60255-27.

  • IEEE 1613-2009The North American counterpart for communications networking devices in substations, with a 2011 amendment on DC supplies. Equipment sold into UK and export markets is usually designed to both.

  • IEC 60255-26:2023Electromagnetic compatibility for measuring relays and protection equipment: immunity to continuous and transient, conducted and radiated disturbances including electrostatic discharge, plus emission limits. Any device that sits on the protection network inherits these expectations.

  • IEC 60255-27:2023Product safety for relays and protection equipment rated up to 1,000 V AC or 1,500 V DC: insulation, clearances, dielectric strength, fire and shock hazards. Edition 3 was published in February 2023.

Underneath these sit the IEC 61000-4 basic immunity tests and the IEC 60068-2 environmental tests, which define how each stress is applied.

The numbers

What a substation-grade device is tested against

Operating temperature

Typical commercial or industrial device
0 to 50 °C, sometimes minus 20 to 70 °C
Substation-grade device
Minus 40 to plus 85 °C, with cold start at minus 40

Electrostatic discharge, IEC 61000-4-2

Typical commercial or industrial device
4 kV contact, 8 kV air
Substation-grade device
8 kV contact, 15 kV air

Fast transient burst, IEC 61000-4-4

Coupled from switching contactors and relays.

Typical commercial or industrial device
1 to 2 kV
Substation-grade device
4 kV on power and signal ports

Surge, IEC 61000-4-5

Lightning and switching surges.

Typical commercial or industrial device
1 to 2 kV
Substation-grade device
4 kV on power and signal ports

Damped oscillatory wave, IEC 61000-4-18

The signature of a disconnector operating in an open-air HV or MV yard.

Typical commercial or industrial device
Not usually tested
Substation-grade device
Slow wave at 100 kHz and 1 MHz at kilovolt levels; fast wave at 3, 10 and 30 MHz

Radiated RF immunity, IEC 61000-4-3

Typical commercial or industrial device
3 to 10 V/m
Substation-grade device
35 V/m, 80 MHz to 1 GHz

Supply

Typical commercial or industrial device
Mains adaptor
Substation-grade device
Wide-range station battery DC, with dips and interruptions per IEC 61000-4-11 and 4-29

The substation column reflects levels declared on a representative IEC 61850-3 and IEEE 1613 compliant substation Ethernet switch data sheet. Exact levels depend on the port, the installation class and the edition applied.

What fails first

Five things that work on the bench and die in the yard

  • Electrolytic capacitors

    Lifetime roughly halves for every 10 °C rise. A part rated for 2,000 hours at 105 °C will not see twenty years in a cabinet that spends summers at 70 °C. Solid polymer and ceramic parts, derated hard, are the substation answer.

  • Ethernet magnetics and PHYs

    A 4 kV surge on a signal port finds the weakest isolation path. Transformer isolation, proper common-mode chokes and a layout that keeps the surge return away from the logic ground are not optional.

  • The DC input

    Station batteries dip during breaker operations and are reversed by the occasional installer. Reverse polarity, hold-up through the IEC 61000-4-29 interruptions and a wide input range are the first three requirements of the supply.

  • Clock and reset circuits

    A damped oscillatory wave at 1 MHz couples straight into a reset line or a crystal. The symptom is a device that reboots when a disconnector operates, which is exactly when it is needed.

  • Anything that needs hands

    A jumper, a battery, a fan or a connector that works loose. Twenty years unattended means no moving parts, no consumables and no field adjustment.

How we design for it

EMC and environment are schematic decisions

  1. Classify every port

    Power, signal, communications, enclosure. Each port gets its test levels from the standard before the first component is chosen, and those levels drive the protection and isolation on that port.

  2. Partition the grounds

    Surge and transient energy returns to the enclosure by a path that never crosses the logic. The layout follows the current, not the convenience of the schematic.

  3. Derate for the hot corner

    Every component is checked at plus 85 ambient plus its own rise, and at minus 40 for start-up. Lifetime models are run for the real temperature profile, not the data sheet rating.

  4. Design the power stage with its thermal path

    A GaN or silicon power stage inside an always-on sealed enclosure has a hard thermal budget. Loss is designed against, with the heat path to the enclosure defined in the mechanical model, not discovered on the bench.

  5. Pre-compliance early and often

    Transient, surge and oscillatory wave tests on the first boards, in our own lab, before anything is committed. Finding a reset glitch at this stage costs a resistor. Finding it at the accredited house costs a board spin.

  6. Hand over to the accredited house

    Formal testing against IEC 61850-3, IEEE 1613 and IEC 60255-26 and 27 is done by a certified laboratory. We produce the design evidence and the pre-compliance results that make that visit a confirmation rather than a discovery.

Twenty years

Service life is an availability problem as much as a reliability one

Distribution network assets are planned over regulatory periods that run for five years at a time, and the equipment installed in one period is expected to outlast several. A device designed today may still be in service in the 2040s. Component reliability is one half of that problem and the standards above address it. The other half is availability: whether the processor, the FPGA, the PHY and the memory can still be bought in ten years, and whether the firmware can still be updated securely in fifteen.

This is one of the quieter arguments for programmable logic in substation equipment. FPGA families tend to have long production lives, and a design captured in RTL moves to a successor device with far less effort than firmware written to a discontinued processor. It is also the argument for designing the secure update path at the start, because a device that cannot be patched in year twelve becomes a liability rather than an asset.

In GRID-5G, substation-hardened packaging and EMC pre-compliance are within Novomorphic’s work package for the edge platform, alongside the deterministic protocol processing and on-device inference. The platform is being designed to the environment described here and is planned to be trialled at PNDC against live grid assets.

What we do not claim

Pre-compliance is not certification

Novomorphic designs for the substation environment and runs pre-compliance investigation in-house. We do not certify equipment, and no result from our own lab is described as compliance. Formal testing is carried out by accredited bodies against the editions and classes agreed with the customer, and the certificate is theirs to issue.

Nor does meeting the environmental standards say anything about a device’s function. A unit that survives a 4 kV surge and forwards a GOOSE message late has passed one test and failed the one that matters. Environmental qualification, timing evidence and security assurance are three separate bodies of evidence, and a procurement team should ask for all three.

Sources (9)Every external fact above is cited here so it can be checked rather than believed.

Keep reading

More on Regulated deployment

All insights

Talk to the engineer, not the account manager

Tell us what you are building. We will put you in front of whoever actually knows the answer.

What happens next

1

An engineer reads it

Not a form-handler. Whoever owns the relevant discipline.

2

We come back with a technical view

Including if we think you do not need us.

3

If it looks like a fit, a short technical call

Then, if it is useful, a scoped workshop, feasibility study or evaluation.