Executive summary
The expensive decisions are made early, with the least information. We spend the first engagement on them.
When a hardware programme overruns, the cause is often not implementation but the partition: which function sits in analogue, which in digital logic, which in firmware, which in a standard part, and where the trust boundary goes. Those decisions are made in the first weeks, usually by whoever is in the room, and they are the hardest to undo. So our engagement model is built to spend the early, cheap time on exactly those decisions, and to give you a written output and a place to stop at the end of every stage.
There are four engagement types: an architecture workshop of one to two days, a feasibility study of two to six weeks, an FPGA proof-of-concept of eight to twenty weeks, and a design programme of programme length. Each has a defined input, a defined output and a timebox. Each ends at a gate where you hold a document or hardware you can take elsewhere. Most customers start with the workshop. Some stop there, because the workshop concludes they do not need custom hardware, and we say so.
This guide describes what happens inside each engagement, how we choose which one to recommend, how confidentiality and intellectual property are handled before any technical detail is exchanged, and what we will not do.
The four engagements
Input, output, timebox
Architecture workshop
One to two days with your engineering team. Input: your requirements as they stand, your constraints and whoever owns them. Output: a partitioning opinion, the interface risks named, and a scoped route forward, in writing within a week.
One to two days
Feasibility study
Two to six weeks of analysis. Input: the workshop output and your real numbers. Output: a written report on whether it can be built to your envelope, on which technology, at what risk, with the assumptions exposed so you can challenge them, plus budgets and a costed route.
Two to six weeks
FPGA proof-of-concept
Eight to twenty weeks on hardware. Input: the feasibility report and agreed pass criteria. Output: working hardware, a test report with measured results and their conditions, and a migration assessment that says what should move to silicon and what should not.
Eight to twenty weeks
Design programme
Full development to a tape-out package, or to an integration-ready hardware and firmware assembly. Input: the proof-of-concept results and a signed-off specification. Output: a design ready for tape-out or an integration-ready assembly, with defined gates at each phase.
Programme length
Engagement one
The workshop asks six questions and produces one opinion
The workshop is a working session, not a presentation. We come to you or host you, with the engineers who would actually do the work rather than an account team, and we spend the day on six questions: how fast the system must react, what powers it, how it is connected, how long it will live in the field, what happens if it is compromised, and how many you will make per year. Those six answers constrain the partition far more than most teams expect, and we work through them in the order they constrain each other.
We leave with your constraints written down in your words and ours. You receive, within a week, a written architecture opinion: a proposed partitioning across sense, compute, connect and act; the interfaces we think carry the risk and who currently owns each one; and a recommended next step, which may be a feasibility study, a proof-of-concept, or nothing. Some workshops end with the advice that a standard processor and careful part selection will meet the requirement and that custom hardware is not justified. We regard that as a good outcome and we put it in writing.
The workshop is deliberately cheap relative to what it decides. A partitioning decision made in a day with the right people in the room, and written down, is worth more than a month of implementation on the wrong partition.
Inside the workshop
A one-day agenda
The system in one sentence
An hour. Your team describes what the system is for, who uses it and what happens when it fails, before anyone mentions a part. We write the sentence down and it becomes the test for everything that follows.
The six questions, in order
Two hours. Reaction time, power, connectivity, field life, consequence of compromise, volume. For each, the answer and the follow-up: at what percentile, during what outage, over what period. Disagreements inside your team are recorded, not resolved; they are usually the most valuable output.
Sense, compute, connect, act
Two hours. We draw the four stages and place each function, then argue about the boundaries. Where a function could sit in two places, we record what would decide it. The security and lifecycle rows are drawn across all four.
Interfaces and owners
An hour. Every boundary between stages, and every boundary between your organisation and a supplier, gets a name and an owner. The ones with no owner are the risk list.
The route
Half an hour. What we think the next step is, including none. What a feasibility study or a proof-of-concept would need to establish, and what it would cost to find out.
The written opinion
Within a week. The partitioning opinion, the interface risk list, the open disagreements and the recommended route, in a document your team can take to any supplier, including a competitor of ours.
Engagement two
The feasibility study puts numbers to the opinion and exposes every assumption
A feasibility study takes the workshop output and your real numbers and answers three questions in writing: can this be built to your power, latency, size and cost envelope; on which technology, meaning standard part, FPGA, FPGA with a path to silicon, or custom ASIC; and at what risk, technical and schedule. It runs two to six weeks depending on how much of the signal chain and the compute is novel.
The deliverable is a report with its assumptions exposed. That phrase is doing work. A feasibility report that says "achievable" without showing what it assumed about process node, clock rate, converter resolution, duty cycle or volume is an opinion with a cover page. Ours shows the budget tables: a timing budget allocated across stages, a power budget allocated across blocks, a noise or accuracy budget where the front end matters, and a cost model at your stated volume. Every allocation is marked as a design figure, and the report says which allocations have margin and which are tight.
The report also carries a costed route forward: what a proof-of-concept would cost and prove, what a design programme would cost and how long it would take, and where the gates would be. If the study finds that the right answer is a standard part, the costed route is short and says so.
Where the study depends on a technology we do not own, for example a specific foundry process or a partner's radio, we say what we assumed and how we would confirm it. We design on the Cadence toolchain as a Cadence Design Network partner and we work with Altera FPGA tooling and roadmaps as an Altera Solution Acceleration Partner, so our feasibility assumptions about implementation flow and device capability are grounded in tools we use rather than in datasheets we have read.
Engagement three
The proof-of-concept ends with evidence, not an opinion
A proof-of-concept builds the architecture on FPGA hardware and measures it. It runs eight to twenty weeks, and its purpose is to replace design-spec numbers with measured ones before anyone commits to silicon or to a production hardware design. It begins with pass criteria agreed in writing: which figures must be measured, under which conditions, against which thresholds. Those criteria are what the engagement is judged against.
The hardware is real and it is yours. We use evaluation boards or a custom carrier depending on what the interfaces demand, and the FPGA design is delivered as source with a build that reproduces it. The test report is the main deliverable. It records the conditions, method, sample count, environment and date behind each measured result, so you can hand it to your own review without rewriting it.
The third deliverable is the migration assessment. An FPGA proof-of-concept tells you two things about an eventual ASIC: which functions are stable enough to harden, and which are still changing and should stay programmable. It also tells you, from measured resource use, power and timing, what a silicon implementation would plausibly cost in area and power, assessed rather than assumed. For many customers at hundreds or low thousands of units per year the migration assessment concludes that the FPGA is the product, and the programme stops there with working hardware.
Our funded programmes follow the same order. GRID-5G takes an FPGA-based edge platform from bench work to hardware-in-the-loop trials at a partner facility, with the bench phase coming first.
Engagement four
The design programme has gates, and you can stop at any of them
Specification freeze
The proof-of-concept results and the migration assessment become a signed-off specification. Nothing enters the specification without a source: a measurement, a design analysis or a customer requirement.
Architecture and interface control
Block architecture, interface control documents and the verification plan. For an ASIC this is where the digital, analogue and mixed-signal partitions are fixed and the test strategy is agreed. For a hardware and firmware assembly it is where the board, the firmware architecture and the security boundary are fixed.
Implementation
RTL and verification, analogue design and layout, firmware, board design. Weekly evidence: regression results, timing, power and area against budget. Divergence from the budget is reported when it appears, not at the gate.
Sign-off or build
For silicon: physical verification, timing sign-off, design-for-test and the tape-out package, with a sign-off pack built to survive your own audit. For an assembly: design-for-manufacture review, pre-compliance EMC where the environment demands it, and release of manufacturing data.
Characterisation
Hardware, or first silicon from the foundry, back on the bench and characterised against the specification, with the test conditions recorded. Where a partner or customer facility runs tests, the facility is named in the results.
Handover
Source, documentation, test suites, the test results and a parts and update plan for the field life agreed at the start. The engineers who set the architecture are the engineers who hand it over.
Gate reviews follow the pattern of ISO/IEC/IEEE 15288 technical processes and our ISO 9001 design and development controls, without the ceremony: each gate is a short document stating what was planned, what was produced and what the evidence says.
What we need from you
Each engagement starts with a short list of inputs, and we ask for them in advance
Before the workshop
The requirements as they stand, in whatever form they exist, including the ones that are only in someone's head. The six answers, even provisional. The names of the people who own the constraints: whoever can say what the power budget really is, and whoever will sign off security. A system diagram if there is one, and the honest story of what has been tried.
Before the feasibility study
The workshop output with your corrections. Real numbers: signal levels, rates, accuracy, environment, volume and the target cost. Any interface you cannot change and any part you must use. Access to one engineer who can answer questions within a day.
Before the proof-of-concept
Agreed pass criteria in writing: which figures, which conditions, which thresholds. Representative input data or a way to generate it. Any partner hardware the prototype must talk to, or a simulator for it. A decision on who owns the FPGA source, which by default is you.
Before the design programme
The proof-of-concept test report and migration assessment. A specification freeze date. The field life, the certification regime and the manufacturing route, because each one changes the design from the first week. The contract terms on foreground IP, agreed.
During an engagement
The same engineers, a weekly evidence update, and divergence reported when it appears
The engineers in the workshop are the engineers who do the feasibility work, build the proof-of-concept and test the hardware. We are a small company and we do not run an account layer between you and the people doing the work. The reason is practical rather than sentimental: the person who set a timing budget is the person who knows what it will cost to change it, and a programme loses weeks every time that knowledge has to be reconstructed.
Every engagement longer than a workshop runs a weekly written update. It lists each figure the engagement is meant to establish, where it stands, and what changed this week. A new measurement is reported with its conditions. A number that is drifting away from its budget is reported in the week it drifts, with the options, not at the gate when it is expensive to act on. We would rather send an uncomfortable update early than a polished one late.
Gate reviews are short documents, not ceremonies. Each states what was planned, what was produced, what the evidence says and what we recommend. You can stop at any gate with everything produced so far: documents, source, hardware and results. The recommendation may be to continue, to change direction or to stop, and the third is given as readily as the first.
Commercial shape
Fixed where the scope is known, phased where it is not
The workshop and the feasibility study are fixed-price engagements, because their scope is defined by the engagement itself rather than by what we find. A proof-of-concept is fixed in scope against the agreed pass criteria, with any change in criteria handled as a documented change rather than absorbed quietly. A design programme is phased, with each phase priced at its gate on the evidence from the phase before, because pricing a tape-out before a proof-of-concept exists is guessing with a cover letter.
Where a programme is suitable for public co-funding, for example through an Innovate UK collaborative research and development competition, we will say so and we can help structure it. Our own research programmes run on that model, with consortium agreements governing IP and published competition rules governing the scope. A funded route changes the timetable and the reporting; it does not change the engagement model.
We do not quote figures on this page because the figures depend on the six answers, and a price list that ignored them would be wrong for most readers. What we will do is give a written price for the workshop at the first conversation, and a written price for each later engagement at the gate before it.
Where programmes go wrong
Six failure patterns, and the gate that is meant to catch each one
Partition by habit. The team starts from a part they know and the architecture follows. Caught by the workshop, which starts from the six answers instead.
The envelope that never closed. Power, latency or cost was always a factor of two away and everyone hoped. Caught by the feasibility budgets, which show the margin on each line.
Interfaces nobody owns. The analogue team and the digital team each assumed the other handled the clock domain, the isolation or the calibration. Caught by the workshop's interface risk list and the design programme's interface control documents.
Silicon from slides. A tape-out committed on design-spec numbers with no hardware evidence. Caught by the rule that a design programme needs a proof-of-concept or equivalent behind its specification.
Security bolted on. A trust boundary drawn after the partition was fixed, so it cuts through a function instead of around it. Caught by treating the fifth question, consequence of compromise, as a partitioning constraint from day one.
Lifecycle discovered in year eight. A part goes end of life, a signature algorithm is deprecated, a field update fails in a cabinet. Caught by the fourth question and the handover plan, which name the parts, the cryptographic agility and the recovery path before shipment.
Choosing
How we decide which engagement to recommend
If the partition is undecided, start with the workshop. Everything downstream depends on it and a day is cheap.
If the partition is decided but the envelope is tight, the feasibility study will tell you whether it closes before you spend on hardware. Tight means power, latency or cost within a factor of two of what the obvious technology can do.
If the envelope closes on paper and silicon is a possibility, the proof-of-concept is mandatory. We will not propose a tape-out from design-spec numbers alone.
If you already have FPGA evidence, we can start at the migration assessment and the design programme, after a short review of the results.
If volume is in the hundreds and the FPGA meets the envelope, we will recommend the FPGA as the product and a hardware and firmware design programme rather than an ASIC.
If the requirement is seconds, mains power and no security consequence, we will probably recommend a standard processor and a short conversation.
Before any of it
Confidentiality and IP are agreed before technical detail is exchanged
We sign a non-disclosure agreement before any technical detail is exchanged, and we will send ours first if you ask. Foreground intellectual property ownership is agreed in the contract before work starts, not negotiated afterwards. Our default position is that foreground IP created for you is yours, with Novomorphic retaining background IP and the right to reuse generic building blocks that contain nothing of yours. Where a funded programme is involved the consortium agreement governs, and we tell you so at the outset.
We publish nothing about a customer programme without written permission. Our own research and development goes through a technical, IP and export-control review before anything reaches this website, and the same review applies to anything we would say about working with you. For customers in aerospace, defence and security, we are on the JOSCAR register that your supply chain team will already use to pre-qualify suppliers, and we hold ISO 9001 and ISO 27001 certification and Cyber Essentials Plus, which matter wherever your IP sits on our systems.
What we do not do
The boundaries of the offer
- We design semiconductors and electronic systems and we prove them on hardware
- We own the interfaces between analogue, digital, RF, power, firmware and security, which is where programmes usually lose time, and we stay with the programme from architecture to characterisation
Not included
We do not fabricate silicon, and we do not claim to. We do not manufacture boards at volume; we design for manufacture and hand over to your contract manufacturer or ours. We do not act as a radio or core network supplier. We do not take on a design programme without a proof-of-concept or equivalent evidence behind the specification, and we do not quote a tape-out from a slide deck.
After handover
The programme ends. The record of how it was built does not.
Handover is the last gate of the design programme, not the last contact. The budgets, test results and design rationale built up through the programme are handed over as a living record, and they are the natural place for field data to land once the system is deployed. A result from your bench or your customer's site belongs beside ours, in the same format, so that the history of every figure runs from the first design allocation to the field.
For long-life systems we offer a standing arrangement around the lifecycle plan agreed at the start: parts watch against the longevity programmes the design relied on, a review when a cryptographic algorithm is deprecated, and a defined path for porting a function out of a part that goes end of life. None of that is exotic. It is the maintenance a fifteen-year design needs and rarely gets, because the team that understood the partition has usually moved on by year eight. We would rather it stayed in the room.
Where a programme produced results that both parties are willing to publish, that record is also where a case study comes from, with your written permission on every figure and every image. We publish nothing about a customer programme otherwise.
Starting
What a first conversation covers
An engineer reads every enquiry; not a form handler, but whoever owns the relevant discipline. The first conversation covers whether the architecture you have in mind will meet the constraints you actually have, where the integration risk sits and who currently owns it, whether custom silicon is justified or whether an FPGA or a standard part is the better answer, and what a bounded first engagement would look like. If it looks like a fit, the next step is a short technical call and then a scoped workshop. If it does not, we will tell you, and we will tell you why.